The Hobson project consists of two stand-alone warehousing facilities totalling approximately 12,000m² which are interconnected by a central breezeway. Each of the buildings has an attached two storey office, one of which is the headquarters for the Hobson Engineering business. Prime Constructions were engaged to design and construct this facility from inception including the preparation of the development application. The project included a high racking load requirement and a premium quality warehouse floor to cater for specific materials handling equipment.