Prime Constructions have delivered the 165,000m² Yennora Logistics Hub for Fife Capital including three separate buildings.
As the capacity of the existing stormwater drainage system was limited, a 3,000,000 litre stormwater detention system was incorporated to reduce the impact on the adjacent creek.